This highly detailed repair manual covers all repairs and servicing. All technical details taken directly from the manufacturer can be found in this manual, It is the factory manual from the manufacturer. Challenger 645C , 647C Combine Repair Time Schedule Manual is the same manual used by professional technicians, mechanics and workshops around the world.

 

Challenger 645C , 647C Combine Repair Time Schedule Manual has easy to read text sections with top quality diagrams and instructions, will guide you through fundamentals of maintaining and repairing, step-by-step, to teach you what the factory trained technicians already know by heart. For that reason, you will not find it difficult to repair or to maintain some of the innovative features loaded on the vehicle when you have the manual. Using this repair manual is the true way to keep your vehicle working properly.

 

 

Models Covers:

Challenger 645C , 647C Combine Repair Time Schedule Manual

 

Manual Covers:

0. Introduction and warranty
01. Generic operations
10. Engine
20. Engine installation
30. Transmission
40. Front elevator
50. Field threshing & separation finger
60. Straw walker
70. Cleaning
80. Grain tank
90. Guards & body
100. Cab
110. Hydraulic system
120. Electrical system
130. Implement & decal
140. Variants & attachments

More Theres——–

 

============
** Total Pages: 1374
** File Format: PDF
** Language: English
** Requirements: Adobe PDF Reader & WinZip
** Compatible: All Versions of Windows & Mac, Linux OS, Iphone, Ipad, Android etc…

 

NO waiting! You will have instant access to your download! All pages are printable, No shipping fee, No waiting nervously for the postal delivery, you can start doing your repairs right away!

We will always try to get the full satisfaction of our customers. Even after you have purchased this manual, we will pay full attention to any issues, regardless of the nature of the situation.

 

THE DOWNLOAD LINK WILL ALSO BE SENT TO YOUR E-MAIL.

 

So please make sure your email address is correct. Don’t Forget to Check Spam / Junk if can’t find the new message in your email inbox immediately.

 

Any questions please contact: admin@servicemanualperfect.com

Thanks for visiting!